PPF Project Summary

No. Project Type Project Title 
1 Guideline Recovery or Re-Railing of Rolling Stock
2 Code of Practice Identification of Location on Track
3 Guideline Guideline on the Mechanical Versus Static Vertical Transportation
4 Guideline Guideline for the Implementation of Graffiti Detection Tools
5 Guideline Guideline for the Suitable Treatment of Flange Gaps at Level Crossings
6 Guideline Rail System Description Models
7 Guideline Technical Guideline for Interoperability – Rolling Stock
8 Guideline Maintenance Facilities Shunting Operations Guideline
9 Code of Practice  Grade Separation for Light Rail Systems
10 Guideline  Third Parties Accessing a Rail Corridor
11 Guideline  Asset Management Systems Utilised for Condition Monitoring of Rail Infrastructure
12 Guideline  Application of Safety Integrity Levels in Australian Rail Projects
13 Code of Practice  Sustainable Design and Construction in Rail
14 Standard Service Transition and Operational Readiness Review of New or Modified Rolling Stock
15 Guideline Guideline Condition Monitor of Rolling Stock Equipment
16 Standard Above Ground Railway Stations – Fire Safety Measures
17 Guideline Guideline and Toolkit National Guideline for the Prevention and Management of Suicide on the Railway and Toolkit for the Prevention and Management of Suicide on the Railway
18 Guideline Track Centreline Construction and Management Guideline
19 Code of Practice National Standardisation of Rolling Stock Refuelling Practices and Hardware
20 Standard Light Rail Traction Power System Configuration and Performance Requirements for Stray Current Minimisation and Mitigation
21 Standard Approach to Developing an Operations Concepts Definition
22 Guideline Effective Group Decision Making within the Rail Industry
23 Standard Rail Tractor Power Harmonisation
24 Guideline Reliability, Availability and Maintainability (RAM) Guideline for the Australian Rail Industry
25 Standard System Safety Assurance for the Rail Industry
26 Code of Practice System Safety Assurance for the Rail Industry
27 Code of Practice Train Control Systems Application Design Code of Practice Signalling Plans Module
28 Guideline Preparing for the Effects of Global Warming on Rail Infrastructure and Operations
29 Code of Practice COP Work on or Near Electrification Infrastructure
30 Guideline Guideline for the Categorisation of Safeworking Breaches
31 Guideline AS 7770 Rail Cyber Security Reference Architecture
32 Guideline Introducing and Managing Communication Based Train Control (CBTC) Systems and Operations in Australia
33 Standard Train Braking Rates
34 Guideline Cybersecurity for Signalling Interlockings
35 Standard Environmental Requirements for Signalling Interlockings and Train Control Systems Equipment