DB Engineering & Consulting Wins Contract for Bad Kleinen Curve

DB Engineering & Consulting has won the tender for the construction of the Bad Kleinen ‘connecting curve’, part of the line upgrade between Lübeck and Schwerin in northern Germany. The 63km route from Lübeck to Bad Kleinen is currently a single-track, non-electrified main line with a maximum line speed of 120km/h. Operations between Lübeck and […]

The post DB Engineering & Consulting Wins Contract for Bad Kleinen Curve appeared first on Railway-News.